Optimization of the Slab Cooling Process After Continuous Casting Using Numerical Simulation

Monitoring the thermal condition of slab piles after continuous casting is essential for the logistics operation of a steel plant, ensuring compliance with shipment deadlines and enabling further processing steps that require a minimum slab temperature. To achieve the necessary accuracy, cooling procedures must account for the dimensions of the slab pile, as cooling time is influenced by both the size and the number of stacked slabs. In this work, correlations for slab pile cooling times were developed through numerical simulations and subsequently integrated into the plant’s logistics system.